TERRACE INSTALLATION AND REPAIR
- Terrace repair-waterproofing works
- New terraces installation
- Production and installation of fencing
- Consultation on the site for optimum terrace repair system
TERRACE REPAIR SYSTEMS
System A1 - Existing floor coverings + polyurethane waterproofing / EPDM membrane / adhesive coating + rubber support + stone tiles (20 mm).
System A2 - Existing floor covering + 2 layers of polymeric bitumen waterproofing + patio boards.
System A3 - Existing flooring + EPDM membrane + rubber-drain tiles 30 mm / terrace boards.
System A4 - Existing floor covering / leveling layer + polyurethane coating / system (available with multi-colored decorative feed).
NOTE: Repair solutions are possible if: there are terraces coating strong enough to floor height allows installation of an additional coating (rubber-drainage tiles ~ 30 mm, terrace boards ~ 70 mm), adequate gradients.
TERRACE EQUIPMENT SYSTEMS
System B1 - G / b + smėlbetonio plate ramped vapor barrier layer + + + EPDM thermal insulation layer / 2 layers polimerbituminės waterproofing sheet + + drain equalizing smėlbetonio reinforced layer.
System B2 - G / b plate + steam insulation + thermo-insulating layer + slabs for concrete concrete + EPDM membrane + rubber-drainage tiles 30 mm / terrace boards.
System B3 - G / b plate + steam insulation + thermo-insulating layer + sloping layer for concrete + EPDM membrane / polyurethane waterproofing / matting + rubber holder + stone tiles (20 mm).
System B4 - G / b plate + steam insulation + thermal insulation layer + sloped concrete slab + 2 layers of polymeric bitumen waterproofing + terrace boards.
Reverse system - when the waterproofing layer is installed under the thermal insulation layer (XPS). The system is regulated by the Construction Technical Regulation (STR).